Understand the plant
Review flow, organic loading, treatment configuration and operating history.

A better future for wastewater · Mexico
Make the infrastructure you already have
work better.
Puro Agua brings The Ydro Process® to wastewater treatment in Mexico — targeting less sludge, lower energy use and better plant performance.
The opportunity
Treating water shouldn’t mean accepting ever-higher operating costs.
Sludge handling and aeration put daily pressure on plant budgets. The Ydro Process® enhances the biological treatment already taking place, helping operators address these costs without material plant reconstruction.
See the economics01 / Less sludge
Up to80%
Less excess sludge to dewater, transport and dispose of.
02 / Lower energy
20–30%
Reduce aeration demand while improving treatment performance.
03 / Existing infrastructure
Integrated into the biological process you already run.
The Ydro Process®
A tailored microbial application supports the breakdown of organic matter. We work with your team to establish the right dose, the right application points and the right measures of success.
Review flow, organic loading, treatment configuration and operating history.
Apply The Ydro Process® at defined dosing points as a recurring daily treatment.
Track sludge, electricity, effluent quality and odour against an agreed baseline.
Sludge management / Energy use / Effluent quality / Odour control
From application to evidence
From a completed commercial odour-control application to broader plant trials, our work in Mexico is built around measurable operating priorities.
Commercial wastewater
Shopping-centre site · Mexico · 1 L/s
A treatment plant beneath a car park, with a clear brief: resolve problematic wastewater odour.
Municipal water authority
AYST · Toluca · 10 L/s
A reference programme in a municipal water authority environment, focused on the economics of day-to-day treatment.
Federal institution
Defensa · Mexico · 20 L/s
An institutional application designed to evaluate performance across the treatment process.
International operating experience
The business case
We build the business case using your sludge disposal costs, electricity consumption and proposed Ydro requirement.
Explore your plant’s economicsIllustration from the September 2026 deck. Sludge and electricity cost assumptions are extrapolated from operating data supplied for PTAR Aurea to a representative 75 L/s plant. The model assumes 70% sludge reduction and 20% electricity reduction.
$243,750 gross operational savings − $111,000 Ydro spend = $132,750 net annual savings. This is an illustrative model, not a measured plant result or a quotation. Other operating costs are outside the comparison.
Working with Puro Agua
A practical, five-stage approach. Your operating team is involved throughout, from the initial plant assessment to trial review.
Understand your flow, laboratory results, operating costs and treatment configuration.
Define the product requirement and appropriate dosing locations for your plant.
Compare the proposed treatment cost with potential operational savings.
Agree assumptions, success criteria and trial structure with your engineers.
Manage dosing, monitor agreed indicators and review the results together.
Where we work
Biological treatment systems facing sludge, energy and effluent-quality pressures.
Site-specific applications for organic loading, fats, grease and wastewater odour.
Assessing biological treatment opportunities in affected rivers and lakes.
Puro Agua · Mexico
We bring together commercial execution, Mexican institutional knowledge and specialist technical support to take each application from assessment to implementation.
Co-founder
Leads commercial and technical execution: plant qualification, application design, customer economics and implementation.
Contact LucasCo-founder
Mexico-based operating partner, leading institutional relationships, senior customer engagement and local commercial execution.
Contact Allan
Strategic adviser
Former Director General, CONAGUA
Provides senior Mexican water-sector insight, institutional knowledge and strategic guidance.
A few practical questions
The Ydro Process® is introduced into the existing biological treatment process. Material reconstruction is generally not the starting point. Dosing arrangements, equipment needs and any operating changes are determined during the plant assessment.
We begin with flow, process configuration, recent influent and effluent results, sludge production and disposal costs, electricity use and a plant schematic. An initial conversation identifies any gaps before an application is designed.
We agree a baseline and success criteria before implementation. Depending on your objectives, monitoring can include sludge volume, electricity, effluent parameters and odour. Consistent sampling and operating records help distinguish treatment effects from normal plant variation.
No single savings figure applies to every plant. Flow, organic loading, process conditions and local costs all matter. The figures shown here are targets or labelled illustrations; your technical assessment and trial establish the relevant case.
Let’s talk about your plant
Tell us about your treatment system and the challenge you want to solve. We’ll start with a conversation about what a plant assessment should cover.